Client : BOUYGUES BATIMENT INTERNATIONAL
PROJECT: Turkmenbashy State Commercial Bank of Turkmenistan – Turkmenistan, July 2019 – March 2020
Infrastructure and landscaping works under the completed project in Ashgabat city Turkmenistan, were completed under our contractual obligations. Together with all the infrastructure systems of the project, such as drainage, storm sewage, waste water, electric pipelining (medium voltage, low-voltage, telephone and data lines), utility and irrigation water systems, as well as excavation of fire hydrant infrastructure lines, pipelining, making of prefabricated and on-site well / valve chambers, and within the scope of landscaping works, the backfilling, excavation, earth fill, concrete and granite curbs, concrete pavement of sidewalks and roads were also carried out successfully and acceptance is completed by the client.