PROJECT PORTFOLIO
Chandybil Roads – TURKMENISTAN 2010-2011
The project, the construction of which was completed as 28.5 km to the south of Ashgabat city, consists of the main road with 8 traffic lanes (4 entrance and 4 exit lanes) with a platform width of 80 mt, the service road with 4 traffic lanes (2 entrance and 2 exit lanes) and parallel roads.
Within the scope of the project, there are 4 bridge interchanges constructed with the post tensioning system, 5 roundabouts, 8 underpasses, 17 km energy and communication lines service gallery, 236,241,00 m2 pedestrian road, 298 km curbs, 78 km rainwater drainage system, 44,880 mt precast trapezoidal rainwater channel, 530.000 m2 green area landscaping, 13 water reservoirs, LED traffic guidance system, camera radar system and 48 passenger stops.