BTC PT3 pump station – TURKEY 2003-2006
The station was constructed between 2003 and 2006 at an altitude of 2300 m in Bashkoy, in Chayyrly District of Erzincan along Baku-Tbilisi-Ceyhan crude oil pipeline, and it was put into operation in 2006.
The pump station consists of a pump building equipped with 4 Wartsilla pumps, absorption towers, a piping building, a fire building and fire water tank, an automation and administrative building workshop, a relief building and tanks, a security building, a canteen building, lodging buildings, technical buildings, a treatment plant and a heliport.