Ashgabat – Turkmenbashy Highway – TURKMENISTAN 2016-2018
The project is designed as a part of the trans Asian transportation on the historical Silk Road, with the highway length of 564 km, section width of 34,5 m, 1 Cloverleaf Interchange, 7 Trump Interchanges, 1 roundabout, 69 bridges, 434 culverts, 83 underpasses, 16 recreation areas, 4 service areas, 6 maintenance facilities, 9 toll booths, green space of 768.000,00 m²
The brief information about the main production sizes of the project is given below.
- Excavation Amount: 45.658.000,00 m3
- Fill Amount: 73.825.000.00 m3
- Sub-Base Amount: 10.060.000.00 tons
- Plant Mix Amount: 9.570.000.00 tons
- Asphalt Amount: 8,962,000,00 tons
- Bitumen Amount: 358.510,00 ton
- Concrete Amount: 550.000,00 m3