A quality management system is established by creating a quality plan that complies with the project contract and technical specifications. ITP, MoS (construction methods) and project technical documentation are prepared based on the relevant project features and details. Through laboratory installation and services in accordance with the technical requirements requirements and details, field quality control, test, and test application reporting are performed
- Establishment of quality system
- Preparation of quality plan, ITP, MoS technical project documents
- Laboratory installation and services
- Field quality test applications and reporting
- A quality management system is established by creating a quality plan that complies with the project contract and technical specifications. ITP, MoS (construction methods) and project technical documentation are prepared based on the relevant project features and details. Through laboratory installation and services in accordance with the technical requirements requirements and details, field quality control test-test application-reporting are performed
- Establishment of quality system
- Preparation of quality plan, ITP, MoS technical project documents
- Laboratory installation and services
- Field quality test applications and reporting