PROJECT PORTFOLIO
Turkmenbashy International Airport – TURKMENISTAN 2009-2010
Completed in Turkmenbashy city, the project is equipped with 34.000 m2 domestic and international passenger terminal with a capacity of 800 passengers per hour, 3.500 m long (248.600 m2) aircraft runway, 74.587 m2 aprons with 6 fuel pit, 65 m high traffic control tower, cargo terminal, VIP passenger terminal, a closed car park with a capacity of 252 vehicles, a fuel farm with a capacity of 8,000 m3, a 6 inch wide and 10,000 m long fuel pipeline and technical buildings.